I had to go away last week, so it was two weeks between visits and it was certainly all coming together when I went to the house on Saturday. The lights and fans were being installed, painting was completed (baring a few touch ups), the showers and toilets were installed, kitchen sink installed, the stained glass had been replaced by Harkaway, chimneys were up, the gas connection was done, fences on both sides replaced and base boards painted. The pressed metal splashbacks had still not be installed and the ensuite pressed metal has not had the dado rails installed.
Category Archives: doors
Lots more progress
There has been lots of progress in the last two weeks:
- Bathroom and ensuite pressed metal
- Kitchen and pantry cabinetry
- Solar panels installed
- Steps at the front and side (laundry door)
- Internal painting
- Cupboard shelving
- Stained glass fitted
Stained glass installed
Stained glass installed
Pantry stained glass window
Stained glass on front door – clear not obscured
Doors, architraves and skirting boards
The internal doors were delivered last week – a great big pile of them!
This week, most of them have been installed and the architraves are going up around the doors and windows. The skirting boards are also going on.