It’s almost finished!

I had to go away last week, so it was two weeks between visits and it was certainly all coming together when I went to the house on Saturday.  The lights and fans were being installed, painting was completed (baring a few touch ups), the showers and toilets were installed, kitchen sink installed, the stained glass had been replaced by Harkaway, chimneys were up,  the gas connection was done, fences on both sides replaced and base boards painted.  The pressed metal splashbacks had still not be installed and the ensuite pressed metal has not had the dado rails installed.

Vestibule Door hung
Vestibule Door hung
Switches
Switches
Pantry Light
Pantry Light
Outside Lights
Outside Lights
Kitchen Lights
Kitchen Lights
Kitchen Lights
Kitchen Lights
Kitchen Painting Completed
Kitchen Painting Completed
Living Area - Ceiling Fan
Living Area – Ceiling Fan
Outside Complete
Outside Complete
Kitchen Bench
Kitchen Bench
Hallway Lights
Hallway Lights
Front Door Stained Glass - obscured
Front Door Stained Glass – obscured
Bath
Bath
Ensuite Shower
Ensuite Shower
Ensuite Shower
Ensuite Shower