The floor is on

The floor has been installed (well, the base boards for the floor to be laid on) with under floor insulation.  The ducting for the central heating and the plumbing has been fitted underneath the house, although there seem to be a few missing plumbing points – something to confirm with the builder.

It’s almost time for the frame to go up!